<div>Dear Kai,</div>
<div> </div>
<div>Thank you for the clarifications, it is a big help on cost implications. I hope the VISP scenario will create more uptake of purchased capacity allowing for lower pricing at landing stations to become cheaper.</div>

<div> </div>
<div>I think it would be even nicer to do some math which ISPs are not passing on. I hope to list it soon and corrections are welcome.</div>
<div> </div>
<div>Rgds.</div>
<div> </div>
<div>Aki<br></div>
<div class="gmail_quote">On Fri, Oct 9, 2009 at 7:29 AM, Kai Wulff <span dir="ltr"><<a href="mailto:kai.wulff@kdn.co.ke">kai.wulff@kdn.co.ke</a>></span> wrote:<br>
<blockquote style="BORDER-LEFT: #ccc 1px solid; MARGIN: 0px 0px 0px 0.8ex; PADDING-LEFT: 1ex" class="gmail_quote">
<div bgcolor="#ffffff">
<div><font size="2" face="Verdana">Aki,</font></div>
<div><font size="2" face="Verdana"></font> </div>
<div><font size="2" face="Verdana">a word from the economist ..</font></div>
<div><font size="2" face="Verdana"></font> </div>
<div><font size="2" face="Verdana">You cannot divide the cost of a system by the capacity one has ... You have to divide the cost by the capacity that can be sold ..</font></div>
<div><font size="2" face="Verdana"></font> </div>
<div><font size="2" face="Verdana">Let's assume we sell in the first year 10Gbps of the TEAMS capacity (jointly between all operators) and the investors want to have at least the return anybody expects from injected cash (I am taking the yields of the latest Infrastructure Bond as benchmark).</font></div>

<div><font size="2" face="Verdana"></font> </div>
<div><font size="2" face="Verdana">So:</font></div>
<div><font size="2" face="Verdana"></font> </div>
<div><font size="2" face="Verdana">130M USD to be returned in 5 years</font></div>
<div><font size="2" face="Verdana"></font> </div>
<div><font size="2" face="Verdana">1st year = 26 000 000 USD + 4% OaM = 31 200 000 USD</font></div>
<div><font size="2" face="Verdana"></font> </div>
<div><font size="2" face="Verdana">That makes per Mbps and month 260 USD</font></div>
<div><font size="2" face="Verdana"></font> </div>
<div><font size="2" face="Verdana">If we say we can sell 20Gbps then it would be 130 USD ... Let me stick to 10 for now ..</font></div>
<div><font size="2" face="Verdana"></font> </div>
<div><font size="2" face="Verdana">Cross Connection in Fujeira between the TEAMS Landing and the SMW4 Landing on lease for 4 x STM16 = 200 000 USD per month = 20 USD per Mbps and month</font></div>
<div><font size="2" face="Verdana"></font> </div>
<div><font size="2" face="Verdana">Onward Capacity from U.A.E. to London per STM16 approx. 150 000 USD per month = USD 60 per Mbps</font></div>
<div><font size="2" face="Verdana"></font> </div>
<div><font size="2" face="Verdana">Add USD 20 per Mbps for all peering and hosting charges in London and you will have: USD 360 per Mbps and month ...</font></div>
<div><font size="2" face="Verdana"></font> </div>
<div><font size="2" face="Verdana"></font> </div>
<div><font size="2" face="Verdana">This case assumes the 4 x STM16 are sold from day 1 in full .. Surely we can assume a straight line take-up that might peak in even 20Gbps after 12 month, then the first year will still be as above. The second year would be in the range of 210 - 230 USD .....</font></div>

<div><font size="2" face="Verdana"></font> </div>
<div><font size="2" face="Verdana">All the above is calculating 0 overheads at the operator's level .. </font></div>
<div><font size="2" face="Verdana"></font> </div>
<div><font size="2" face="Verdana"></font> </div>
<div><font size="2" face="Verdana">No magic .. Just math ..</font></div>
<div><font size="2" face="Verdana"></font> </div>
<div><font size="2" face="Verdana">Rgds</font></div>
<div><font size="2" face="Verdana"></font> </div>
<div><font size="2" face="Verdana">Kai</font></div>
<div><font size="2" face="Verdana"></font> </div>
<div><font size="2" face="Verdana"></font> </div></div></blockquote></div>