Listers Evans has raised a pertinent issue, we might not have made some of the strides we have achieved in the sector without the used computers, on the other hand there is an environmental concern that is valid, this calls for a multistakeholder approach to create a win win situation for our local business men (Remember the used car parts issue that sprang up early this year), NGO and any other organisation involved in the importation process, may be its time KEBS got involved in the process, reading through Bills email i am of the opinion that there might be some imbalance in the way the importation of the computers is handled, by the way i had there is a facility for disposing off e-waste in Dandora, maybe Mr Tom Musili could shed some light on the issue, i wish we had statistics to help in evaluating the impact of the used computers.<br>
Let the debate continue..<br><br><div class="gmail_quote">On Fri, Aug 28, 2009 at 11:26 AM, Bildad Kagai <span dir="ltr"><<a href="mailto:billkagai@gmail.com">billkagai@gmail.com</a>></span> wrote:<br><blockquote class="gmail_quote" style="border-left: 1px solid rgb(204, 204, 204); margin: 0pt 0pt 0pt 0.8ex; padding-left: 1ex;">
<div style=""><div class="im"><br><div><div>On Aug 28, 2009, at 8:12 AM, Victor Gathara wrote:</div><br><blockquote type="cite"><div> I am thinking here of donations of used computers that can<br>make their way into the country through a regulated and monitored<br>
channel (such as ComputerAid) who will also have responsibility to<br>ensure EOL disposal according to WEEE standards to prevent dumping of<br>electronic waste.<font color="#000000"><font color="#144fae"><br></font></font></div>
</blockquote><br></div></div><div>Victor,</div><div>In your position, you know very well that these second had computers are not donations. You can ask Tony Roberts how much he is paid to dispose a computer from Barclays in UK, that eventually finds its way to a school in Mau. And the Mau school pays for shipping and other costs....but besides all these politics......DFID might consider to fund a specific study comparing the final 'landed' cost of a dumped computer versus a 'clone' assembled with new parts at Crescent Technologies or JKUAT taking into consideration the kazi kwa vijana created....if it has not been done already. PS. I am speaking as a 'contributor' to this mess here, because I also have problems disposing my old computers and printers in the office. Most of the times, its easier to take them to a school in shags that cannot afford the electricity bills of running them...and... just live with the guilt like everyone else despite being labeled as The Hero who brought us computers.</div>
<div><br></div><div>One reason IBM sold its hardware unit was because Moores Law states over time, the cost of hardware approaches zero and the cost of power consumption and capacity of the hardware doubles every 18 months.  Thus, bringing 5 year old computers to Kenya only drains too much power when we should strive to bring consumption per watt down. At least, just based on power consumption alone, dumped computer should never see the 'light of day' at the Kenyan port if locally assembled computers will consume half of the wattage today....especially now when everyone is striving to go green.</div>
<div><br></div><div><a href="http://www.codinghorror.com/blog/archives/000868.html" target="_blank">http://www.codinghorror.com/blog/archives/000868.html</a></div><div><br></div><div><span style="font-family: calibri,tahoma,arial,sans-serif; line-height: 20px;"><font size="2"><span style="font-size: 10px;"><font color="#ff0000">Google, for example, has watched its energy consumption almost double during the past three generations of upgrades to its sprawling computing infrastructure. </font></span></font><b><font size="2"><span style="font-size: 10px;"><font color="#ff0000">It recently unveiled a major new datacenter site in a remote part of Oregon, where power costs are a fraction of those at Google's home base in Silicon Valley.</font></span></font></b><font size="2"><span style="font-size: 10px;"><font color="#ff0000"> But cheap power may not be enough. Last year, Google engineer Luiz Andr� Barroso predicted that energy costs would dwarf equipment costs -- "possibly by a large margin" -- if power-hungry datacenters didn't mend their ways. Barroso went on to warn that datacenters' growing appetite for power "could have serious consequences for the overall affordability of computing, not to mention the overall health of the planet."</font></span></font></span></div>
<div><br></div></div><br>_______________________________________________<br>
kictanet mailing list<br>
<a href="mailto:kictanet@lists.kictanet.or.ke">kictanet@lists.kictanet.or.ke</a><br>
<a href="http://lists.kictanet.or.ke/mailman/listinfo/kictanet" target="_blank">http://lists.kictanet.or.ke/mailman/listinfo/kictanet</a><br>
<br>
This message was sent to: <a href="mailto:otieno.barrack@gmail.com">otieno.barrack@gmail.com</a><br>
Unsubscribe or change your options at <a href="http://lists.kictanet.or.ke/mailman/options/kictanet/otieno.barrack%40gmail.com" target="_blank">http://lists.kictanet.or.ke/mailman/options/kictanet/otieno.barrack%40gmail.com</a><br>

<br></blockquote></div><br><br clear="all"><br>-- <br>Barrack O. Otieno<br>Administrative Manager <br>Afriregister Ltd (Ke)<br>P.o.Box 21682<br>Nairobi 00100<br>Tel:<br>+254721325277<br>+254733206359<br>Riara Road, Bamboo Lane<br>
<a href="http://www.afriregister.com">www.afriregister.com</a><br>ICANN accredited registrar.<br><br>